South Runway (9R-27L) Expansion at Fort Lauderdale at Hollywood International Airport

ENGINEERING & DESIGN SERVICES

SURVEYING


CONSTRUCTION ADMINISTRATION

This Design-Build project at the Fort Lauderdale International Airport (FLL) will allow for the new South Runway 9R-27L to cross over the existing Perimeter Road, FEC Railway, future rail corridor, and US Highway 1 and extend eastward toward the existing NE 7th Avenue. The project includes runway structures, roadway, and runway design, and all the ancillary and associated project elements including drainage, mechanical, electrical, plumbing, life safety, markings, signage, utilities, and buildings.

We provided to the Design Build Team Engineering Leader, HNTB, all the Utility Relocation Designs and all the Coordination for Utility Relocations or abandonment of existing utilities which conflict with the proposed work. PDS was also responsible for all the water and wastewater designs, including the design of the water and sewer services for the fire suppression system and mechanical building.

This project included:

  • Water, Wastewater and Utility Design and permitting of new infrastructure.
  • Utility Relocation Design and Coordination.
  • Utility Coordination with Utility Companies, Owner, Contractor, and Client.
  • Construction Management and Support Services and Engineering during construction services.